History

INTEC Synthesis Gas Systems

2013

Development of the modular synthesis gas plant series INTEC SG

INTEC
SG 300

Image not available

2011

Completion of the long-term evaluation of the first INTEC Synthesis Gas System

1. INTEC
SG Series

Image not available

Pre-shredding, metal separation, drying

Image not available

Reactor, gasifier and heat exchanger

Image not available

2009
-
2010

Increase of the throughput capacity
and the gas quality by application of pure oxygen

1. INTEC
SG Series

2005
-
2008

Optimisation of the waste conditioning to reduce device soiling
and optimisation of functionality during continuous operation

1. INTEC
SG Series

2003
-
2004

Optimisation of waste conditioning
and drying as well as optimisation of the process stability

1. INTEC
SG Series

2000
-
2002

Commissioning and extension of the newly developed synthesis gas plant

1. INTEC
SG Series